Smartland Energy is building the bypass. We deploy behind-the-meter utility-scale power for the world's most demanding AI and industrial loads.
47 accredited investors have requested access this week.
High-yield industrial infrastructure exposure with significant upside through strategic BTM positioning.
* Projected returns are contingent upon receipt of Notice to Proceed (NTP) and are not guaranteed. Target IRR reflects modeled projections based on current assumptions and may differ materially from actual results. This does not constitute an offer or guarantee of investment returns.
Compressed development timeline from capital close to operational groundbreaking and equipment lock-in.
* Timeline is projected upon NTP approval and is subject to permitting, regulatory, and market conditions. Actual timelines may vary and are not guaranteed.
Projected new power requirement for US data centers and domestic manufacturing by 2030.
Maximum new capacity the existing transmission system can theoretically onboard in the same window.
Standard interconnection queue times for traditional utility-scale solar and wind projects.
Bypassing congested transmission lines to deliver power directly to high-load facilities.
18-24 month deployment vs. 7-10 year grid wait times for traditional interconnection.
Leveraging Ohio's pro-energy legislative framework and established utility-friendly corridors.
Total asset-level capitalization for initial sites.
Combined generating capacity across Ohio assets.
Controlled land with existing gas infrastructure.
Target date for operational power delivery.
| Feature | Utility Developers | Smartland Energy |
|---|---|---|
| Scale | Grid Scale (Gigawatts) | check_circle Targeted Campus Scale |
| Interconnection | Slow (7-10 years) | check_circle BTM Speed (1.5-2 years) |
| Site Availability | Waitlist Dependent | check_circle Secure Sites & Rights |
| Pricing Stability | Market Volatile | check_circle Fixed Long-term Offtake |
VP, Gas Power Development
30+ Years Power Industry
30+ year power industry professional with experience in development, construction, commissioning and operation of utility scale power plants at sites around the world.
Chairman & CEO
Strategic Direction & Capital Formation
Leads Smartland Energy's strategic direction across power infrastructure development, capital formation, and project execution. Combines long-term infrastructure planning with disciplined capital markets strategy to drive complex, large-scale energy developments from concept through operation.
Available upon request with verified accreditation.
Site acquisition for initial 150MW campus.
Phase 1 allocation closing. Long-lead equipment secured.
Civil engineering and BTM facility construction start.
Commercial Operation Date for Campus One.
Request your invitation for instant access to the Executive Summary. Full data room access granted within 24 hours of verification.