Critical Energy Infrastructure

America Needs 160 GW
of New Power by
2030.
The Grid Can Deliver
Less Than 50.

Smartland Energy is building the bypass. We deploy behind-the-meter utility-scale power for the world's most demanding AI and industrial loads.

47 accredited investors have requested access this week.

Projected Returns

25%*
Target IRR

High-yield industrial infrastructure exposure with significant upside through strategic BTM positioning.

* Projected returns are contingent upon receipt of Notice to Proceed (NTP) and are not guaranteed. Target IRR reflects modeled projections based on current assumptions and may differ materially from actual results. This does not constitute an offer or guarantee of investment returns.

Priority
12–18 Mo
Expected Window

Compressed development timeline from capital close to operational groundbreaking and equipment lock-in.

* Timeline is projected upon NTP approval and is subject to permitting, regulatory, and market conditions. Actual timelines may vary and are not guaranteed.

160 GW
Total Demand

Projected new power requirement for US data centers and domestic manufacturing by 2030.

<50 GW
Grid Capacity

Maximum new capacity the existing transmission system can theoretically onboard in the same window.

2035+
Wait Times

Standard interconnection queue times for traditional utility-scale solar and wind projects.

It's Behind the Meter.

offline_bolt

Grid Independence

Bypassing congested transmission lines to deliver power directly to high-load facilities.

speed

Speed to Market

18-24 month deployment vs. 7-10 year grid wait times for traditional interconnection.

gavel

Regulatory Certainty

Leveraging Ohio's pro-energy legislative framework and established utility-friendly corridors.

Phase 1 Strategic Target

01
$600M
Target Capex

Total asset-level capitalization for initial sites.

02
300 MW
Active Pipeline

Combined generating capacity across Ohio assets.

03
2 Sites
Site Controlled

Controlled land with existing gas infrastructure.

04
2030
Operations Start

Target date for operational power delivery.

Competitive Landscape

Utility Developers
Smartland Energy
Scale
Grid Scale (Gigawatts)
check_circle Targeted Campus Scale
Interconnection
Slow (7-10 years)
check_circle BTM Speed (1.5-2 years)
Site Availability
Waitlist Dependent
check_circle Secure Sites & Rights
Pricing Stability
Market Volatile
check_circle Fixed Long-term Offtake

Strategic Leadership

Richard Hubbard

Richard Hubbard

VP, Gas Power Development

30+ Years Power Industry

30+ year power industry professional with experience in development, construction, commissioning and operation of utility scale power plants at sites around the world.

Vadim Kleyner

Vadim Kleyner

Chairman & CEO

Strategic Direction & Capital Formation

Leads Smartland Energy's strategic direction across power infrastructure development, capital formation, and project execution. Combines long-term infrastructure planning with disciplined capital markets strategy to drive complex, large-scale energy developments from concept through operation.

Steven Gesis

Steven Gesis

Managing Director, Capital Markets

Capital Formation & Institutional Equity

Oversees all capital formation efforts, including institutional equity and government backed funding.

CLIENTS & PARTNERS (Project identities protected under mutual NDA)

Available upon request with verified accreditation.

Development Roadmap

Q1 2026
check_circle

Pre-Development

Site acquisition for initial 150MW campus.

COMPLETE
NOW OPEN
Q3 2026

Capital Close

Phase 1 allocation closing. Long-lead equipment secured.

Target: $3–5M Pre-NTP Raise
Q1 2028

Groundbreak

Civil engineering and BTM facility construction start.

Target: 300 MW Pipeline
Q4 2030

COD

Commercial Operation Date for Campus One.

Target: 100% Offtake
Phase 1 allocation closing Q3 2026

Request NDA & Investment Memo

Request your invitation for instant access to the Executive Summary. Full data room access granted within 24 hours of verification.

By submitting this form, you consent to receive communications from Smartland via email, phone, or text. Submission does not constitute a commitment to invest.

lock Encrypted & Confidential